Detail Engineering involving the disciplines of Process, Piping, Civil, Electrical & Instrumentation and 3D modelling Using CADWorx for GTA LNG terminal Project including Jetty and Metering Area comprising of Gas Unloading Arm, Terminal Metering, Pig launcher, Gangway, Sea Water Flexible Hose with Quick release, Fire Water Pump (Electrical & Diesel Engine Driven), Fire Water Jockey Pumps. Administration area comprising of Emergency Diesel Generator, Sewage Treatment Package, Oil Water Separation Package, Potable Water Tank, Potable Water Pumps, Service Air Compressor (Mobile), Nitrogen Bottle rack, Water Box. Pipe Rack /Pipe Sleeper Area. TPP Metering Area comprising of Pig Receiver Skid, Thermal Power Plant Metering Package, Pressure control station, Gas Heater, Pressure Reduction Station, Fuel Gas Pressure Reduction skid, Fuel gas Heater and Fuel Gas Buffer.